Thedford Substation

PROJECT INFO

The Thedford 345-115kV Substation has been contracted to Highmark Erectors, Inc. from Nebraska Public Power District. Construction is scheduled to start on or around 9/1/2020 with a tentative completion of 2/1/2021. HEI is responsible for all planning, material coordination, schedule preparation, labor, supervision, miscellaneous materials, tools, apparatus, equipment, mobilization, and demobilization as necessary to complete all work associated with the installation of conduit, ground grid, equipment & fence grounding, control and low voltage cable, steel structures, aluminum pipe bus, switches, outdoor electrical equipment, fine grading, placement of finish rock, and testing of the ground grid and cable integrity to add a 345kV section and modify the existing 115kV portion.

345-115kV Substation

Substation Voltage

February, 2021

Est. Completion Date:

Nebraska Public Power District

Owner

Thedford, NE 69166, USA

Location

Brownfield

Substation Type

Total%20Safety%20Commitment_edited.png

PROJECT GALLERY

press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
1/1

Our safety commitment far exceeds industry standards because we understand that in order to be successful, safety must be paramount.

Erectors_edited.png