Holt 345kV Substation
PROJECT INFO
Nebraska Public Power District has awarded the Holt 345kV Substation to Highmark Erectors, Inc. The Holt Substation is located by Clearwater, NE. Construction started on the Holt 345kV Substation on 5/12/2020 with a completion date of 10/15/2020. Highmark Erectors, Inc. is responsible for all planning, material coordination, schedule preparation, labor, supervision, miscellaneous materials, tools, apparatus, equipment, mobilization, and demobilization as necessary to complete all work associated with the installation of conduit, ground grid, equipment & fence grounding, control and low voltage cable, steel structures, aluminum pipe bus, switches, outdoor electrical equipment, fine grading, placement of finish rock, and testing of the ground grid and cable integrity.
345kV Substation
Substation Voltage
October, 2020
Est. Completion Date:
Nebraska Public Power District
Owner
Holt, NE, USA
Location
Greenfield
Substation Type

PROJECT GALLERY
Our safety commitment far exceeds industry standards because we understand that in order to be successful, safety must be paramount.