
Welcome to
Highmark Erectors, Inc.



Gerald Gentleman Station
PROJECT INFO
The Gerald Gentleman Station has been contracted to Highmark Erectors, Inc. from Nebraska Public Power District. Construction is scheduled to start on or around 9/1/2020 with a tentative completion of 2/1/2021. HEI is responsible for all planning, material coordination, schedule preparation, labor, supervision, miscellaneous materials, tools, apparatus, equipment, mobilization, and demobilization as necessary to complete all work associated with the installation of conduit, ground grid, equipment & fence grounding, control and low voltage cable, steel structures, aluminum pipe bus, switches, outdoor electrical equipment, fine grading, placement of finish rock, and testing of the ground grid and cable integrity to add a new 345kV bay.
345kV Substation
Substation Voltage
February, 2021
Est. Completion Date:
Nebraska Public Power District
Owner
Sutherland, NE 69165, USA
Location
Brownfield
Substation Type

PROJECT GALLERY
Our safety commitment far exceeds industry standards because we understand that in order to be successful, safety must be paramount.
