Vernal Substation, Stage 03
PROJECT INFO
The Vernal Substation, Stage 03 is a terminal addition for Western Area Power Administration, Rocky Mountain Region. The project includes scopes of work such as: misc. site work; concrete foundations; cable trench; steel erection; (1) 138kV power circuit breaker; (2) 138kV disconnecting switches; (1) 138kV disconnecting switch with ground blades; (1) single-phase CCVT; (3) single-phase CTs; rigid and strain buses; below grade and above grade conduit and grounding; substation lighting; power and control cable installation and termination; misc. electrical testing. This project started in the fall of 2019 and will be completed by mid June of 2020 with energization to follow shortly after construction is completed.
115kV Substation
Substation Voltage
June, 2020
Est. Completion Date
Western Area Power Administration
Owner
Vernal, UT 84078, USA
Location
Brownfield
Substation Type

PROJECT GALLERY
Our safety commitment far exceeds industry standards because we understand that in order to be successful, safety must be paramount.