Vernal Substation, Stage 03

PROJECT INFO

The Vernal Substation, Stage 03 is a terminal addition for Western Area Power Administration, Rocky Mountain Region. The project includes scopes of work such as: misc. site work; concrete foundations; cable trench; steel erection; (1) 138kV power circuit breaker; (2) 138kV disconnecting switches; (1) 138kV disconnecting switch with ground blades; (1) single-phase CCVT; (3) single-phase CTs; rigid and strain buses; below grade and above grade conduit and grounding; substation lighting; power and control cable installation and termination; misc. electrical testing. This project started in the fall of 2019 and will be completed by mid June of 2020 with energization to follow shortly after construction is completed.

115kV Substation

Substation Voltage

June, 2020

Est. Completion Date

Western Area Power Administration

Owner

Vernal, UT 84078, USA

Location

Brownfield

Substation Type

PROJECT GALLERY

1/1

Our safety commitment far exceeds industry standards because we understand that in order to be successful, safety must be paramount.

14667 139th Place, Piedmont, SD 57769

(605) 718-7424

highmark@highmarkinc.biz

2014

153

Projects Completed
Year Established

© 2023 by Highmark Erectors, Inc.

  • Facebook - Grey Circle
  • LinkedIn - Grey Circle