Onida Cap Bank Addition
PROJECT INFO
The Onida Capacitor Bank Addition project is being performed for East River Electric. This project will have foundation scope of work, as well as below and above grade grounding and conduit, steel erection, rigid and strain bus installation, power and control cable installation, as well as major equipment installation. A 69kV Capacitor Bank will be added, along with a new 69kV Power Circuit Breaker, and a 69kV Group Operated Disconnect Switch. Construction started on this project in late 2019. Highmark Erectors anticipates completing this project by the end of March 2020.
69-24.9kV Substation
Substation Voltage
March, 2020
Est. Completion Date
East River Electric Power Cooperative, Inc.
Owner
Onida, SD 57564, USA
Location
Brownfield
Substation Type