Linton Substation

PROJECT INFO

Highmark Erectors, Inc. has been contracted to install a deadend structure as well as a TWAC Transformer adjacent to the MDU Linton Substation. The work for this project includes: steel erection, major equipment installation, below and above ground grounding and conduit, power and control cable installation and termination, overhead strain bus, strain bus jumpers, installation of (2) wood poles and associated material, as well as stringing the overhead conductor into the substation. This work started in mid-Aug, and was completed by the end of Sept. 2020.

115kV Substation & Transmission Line

Substation Voltage

October, 2020

Est. Completion Date

KEM Electric Power Cooperative

Owner

Linton, ND 58552, USA

Location

Brownfield

Substation Type

Total%20Safety%20Commitment_edited.png

PROJECT GALLERY

1/1
< Previous Project
Next Project >

Our safety commitment far exceeds industry standards because we understand that in order to be successful, safety must be paramount.

Erectors_edited.png