Koch Substation Circuit Switcher Replacement

PROJECT INFO

Highmark Erectors, Inc. was asked to assist McKenzie Electric with a 115kV Circuit Switcher Change Out. Scopes of work included: removal of existing circuit switcher, installation of new circuit switcher, below and above grade conduit and grounding, power & control cable installation and termination, field acceptance testing. This project was completed in the summer of 2020.

115/25kV Substation

Substation Voltage

October, 2020

Est. Completion Date

McKenzie Electric Co-Op Inc.

Owner

Sidney, MT 59270, USA

Location

Brownfield

Substation Type