Koch Substation Circuit Switcher Replacement
PROJECT INFO
Highmark Erectors, Inc. was asked to assist McKenzie Electric with a 115kV Circuit Switcher Change Out. Scopes of work included: removal of existing circuit switcher, installation of new circuit switcher, below and above grade conduit and grounding, power & control cable installation and termination, field acceptance testing. This project was completed in the summer of 2020.
115/25kV Substation
Substation Voltage
October, 2020
Est. Completion Date
McKenzie Electric Co-Op Inc.
Owner
Sidney, MT 59270, USA
Location
Brownfield
Substation Type