Dry Creek 23o/115kV Station was for Basin Electric.  Construction took place at the DC Tie station south of Rapid City, SD.  The station contained a 230kV line terminal with a 115kV line terminal and a 69kV future addition.  There was over 800 feet of drivable cable tray installed.  And with that the cable tray and the bus work had multiple elevation changes, including one elevation change of close to 13 feet. 